#11
|
|||
|
|||
Quote:
The diagonal wheeling was done after the panel was 99.9% finished. It was done as a "wash over" pass to relieve any tension still in the panel. The twist that Mark and Dan gave the panel helped set the "form/arrangement" just a slight bit. If you have too much crown, the procedure is to wheel outside the overly crowned area and stretch panel. This procedure is all learned by practicing the basics of English wheeling by doing something called the "shape in-shape out" exercise. It is described in my English wheeling book, but also elsewhere.
__________________
Bill Longyard Winston-Salem, NC |
Thread Tools | Search this Thread |
Display Modes | |
|
|